5 Queensborough Terrace - boiler replacement (project AA253)

Current status

Project status 1
Initial Planning

Deciding the scope of works. 

Project status 2
Project design and approval

Finalising the project specification, budget and programme

Project status 3
Onsite
Work starts: 15/07/2024
Work ends: 31/10/2024
Project status 4
Completion

End of works, defects.

Work Element Description of Works
Boiler Flues Survey/review and identify existing boiler flues, which need to be replaced using the existing flue positions.
Building Management System (BMS) control A new BMS panel is required. Design, supply and install of new BMS controls and software to control and monitor boiler plant.
Pipework, valves & Fittings associated with the tank works Supply, install and connect all associated pipework, valves, fittings and overflow/ warning devices associated with the new installation. Provide valve charts and labelling associated with the works.
Water Treatment Water treatment, cleansing, power flushing and re-treatment of pipework systems throughout the whole system in accordance with CIBSE and BSRIA publications.
Thermal Insulation Install new thermal insulation to all new installation and to comply with current regulations and British Standards. Ensure, all pipework is labelled with direction flow arrows.
Maintaining the Existing Building Services Maintain the building services systems during the duration of the contract. Where services may not be functioning or operational for a period of time prior notice and resident notification shall take place
Associated Fire Safety Works Carry out all fire stopping associated with the works. All fire stopping works must be undertaken by a third party certified company who has been certified by an ‘industry-recognised’ body. Ensure the works are fully compliant with current building regulation requirements.

Published: 3 April 2024