Current status
Project status
1
Initial Planning
Deciding the scope of works.
Project status
2
Project design and approval
Finalising the project specification, budget and programme
Project status
3
Project status
4
Completion
End of works, defects.
Work Element | Description of Works |
---|---|
Boiler Flues | Survey/review and identify existing boiler flues, which need to be replaced using the existing flue positions. |
Building Management System (BMS) control | A new BMS panel is required. Design, supply and install of new BMS controls and software to control and monitor boiler plant. |
Pipework, valves & Fittings associated with the tank works | Supply, install and connect all associated pipework, valves, fittings and overflow/ warning devices associated with the new installation. Provide valve charts and labelling associated with the works. |
Water Treatment | Water treatment, cleansing, power flushing and re-treatment of pipework systems throughout the whole system in accordance with CIBSE and BSRIA publications. |
Thermal Insulation | Install new thermal insulation to all new installation and to comply with current regulations and British Standards. Ensure, all pipework is labelled with direction flow arrows. |
Maintaining the Existing Building Services | Maintain the building services systems during the duration of the contract. Where services may not be functioning or operational for a period of time prior notice and resident notification shall take place |
Associated Fire Safety Works | Carry out all fire stopping associated with the works. All fire stopping works must be undertaken by a third party certified company who has been certified by an ‘industry-recognised’ body. Ensure the works are fully compliant with current building regulation requirements. |
Published: 3 April 2024
Last updated: 25 October 2024